Motorists using the Lower Kabete-Ndumbuini and Kapenguria-Uthiru Road interchange have been advised to prepare for traffic disruptions following the planned closure of sections of the road to allow reconstruction works.

The Kenya National Highways Authority (KeNHA) announced that the temporary closure will take effect from Wednesday, December 2, 2026, to facilitate the reconstruction of interchange ramps, loops and slip roads.

In a public notice issued on Wednesday, November 25, the authority said the works would affect traffic movement around the Lower Kabete-Ndumbuini and Kapenguria-Uthiru interchange.

KeNHA has provided alternative routes for motorists to minimise congestion and ensure continued movement during the construction period.

Drivers travelling from the A8 Nairobi-bound carriageway towards Ndumbuini have been advised to use several alternative routes.

One option is to exit at Kabete Technical along Waiyaki Way, proceed to the Naivasha Road roundabout and use the Uthiru Underpass before turning back towards the Nairobi-bound carriageway. Motorists can then access Ndumbuini Shopping Centre through Marigoini Cabro Road.

Another alternative involves exiting at Leadway Petrol Station, proceeding to the Uthiru Underpass and turning back towards Nairobi before using Marigoini Cabro Road to reach Ndumbuini Shopping Centre.

Motorists can also proceed to the 87/Muhuri Interchange, located after Shell Kinoo, and use the 87-Ndumbuini Road beyond 87 Mall.

For those travelling from Rironi and Nakuru towards Ndumbuini, KeNHA has directed motorists to turn at the Muhuri Interchange and proceed through Muhuri to Ndumbuini Road.

Traffic moving from Ndumbuini towards the A8 Nairobi-bound carriageway will also have two alternative routes.

Motorists can use Marigoini Cabro Road to access the Nairobi-bound carriageway. Alternatively, they can take Ndumbuini Road towards the 87/Muhuri Interchange before joining the A8 Nairobi-bound carriageway or proceeding towards Rironi using the Nakuru-bound carriageway.

The authority further stated that motorists travelling from Uthiru and Kawangware would use either the Uthiru Underpass or Muhuri Interchange for all turning movements to and from Naivasha Road.

KeNHA Director General Eng. Luka Kimeli urged motorists to follow the traffic management plan and observe road signs put in place to guide them through the affected areas.

The authority also called on drivers to cooperate with police officers and traffic marshals stationed at the site to help manage traffic and minimise inconvenience during the construction works.

Motorists have been encouraged to familiarise themselves with the alternative routes before beginning their journeys to avoid confusion and delays around the interchange.

The road works are part of the planned reconstruction of the interchange ramps, loops and slip roads, which will require temporary changes to normal traffic movement.

KeNHA has provided a traffic management map showing the affected sections and alternative routes to help motorists navigate the area during the closure.